User Tools

Site Tools


pibot_cnc_laser_series:v588_ultra:check_done:start

🏆 PiBot V5.88 Ultra Checklist Completed

Check Done!

Congratulations! You have completed the PiBot V5.88 Ultra bench inspection checklist. The controller's main input, output, communication, and signal functions have now been verified.
12/12
Checklist steps completed
Bench Test
Board-level I/O verification finished
Next
Prepare your real machine configuration
What You Have Verified
  • Default jumpers and first power-on check.
  • Wi-Fi connection, WebUI access, and TF / microSD card detection.
  • Probe and endstop input signals.
  • Motor signal LEDs for XYZABC axes.
  • Extra I/O, relay, PWM, MOSFET, and other output functions.
  • Basic controller behavior before connecting the real machine.
Checklist progress 100% Complete
!
Important: The Test config.yaml Is Not for Real Machine Use

The config.yaml used in this checklist is a test configuration file only. Its only job is to map the board's pins so you can verify every input and output here on the bench.

It is not a ready-to-run profile for your CNC, laser, router, plasma, or other machine. The motion values, directions, limits, spindle / VFD settings, laser settings, and safety behavior may not match your hardware.

Do not home, jog, cut, engrave, or run a real machine with this test file.

  • Create your own config.yaml using your machine's real settings.
  • Set the correct steps/mm and motor direction for each axis.
  • Set the correct travel limits, max feed rates, and acceleration.
  • Configure homing, limit switches, probe, and E-stop behavior for your machine.
  • Check your driver microstep and current settings.
  • Configure your spindle, VFD, laser, relay, PWM, or MOSFET outputs correctly.
Safe first test: Test with motors free and uncoupled if possible. Do not arm the spindle or laser. Confirm motion direction, limit switch response, homing behavior, and E-stop function before installing the machine for real work.
Recommended Before Real Machine Wiring
  • Save a backup copy of your current test config.yaml.
  • Turn off power before connecting motors, drivers, spindle, laser, VFD, or external devices.
  • Double-check every signal wire before powering the system.
  • Start with low speed, low power, and short movement tests first.
🚀
Achievement Unlocked
  • PiBot V5.88 Ultra Explorer — You have completed the factory-style inspection process.
  • You now know where the main inputs, outputs, communication ports, and signal indicators are located.
  • This makes future wiring, configuration, and troubleshooting much easier.

pibot_cnc_laser_series/v588_ultra/check_done/start.txt · Last modified: by admin

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki