pibot_cnc_laser_series:v496_pro:hardware_connection
Pre-Operation
Important Pre-Operation Checklist
1
YAML Configuration
Configure the appropriate YAML file for your machine before starting any operations.
Ensure YAML settings match your hardware specifications
2
Jumper Verification
Double-check and triple-verify that all jumper positions correspond correctly with your device's operation mode.(Do Not Forget Remove USB 5V jumper)
Incorrect jumper settings may cause equipment damage
3
Power Application
Only proceed with power application after confirming all previous steps are correctly completed.
Safe operation ensured through proper preparation
Critical Safety Reminder
Failure to follow these steps may result in equipment damage or operational failure. Please verify each item carefully before proceeding.
pibot_cnc_laser_series/v496_pro/hardware_connection.txt ยท Last modified: by admin
