User Tools

Site Tools


pibot_cnc_laser_series:v496_pro:hardware_connection

Pre-Operation

โš ๏ธ

Important Pre-Operation Checklist

1

YAML Configuration

Configure the appropriate YAML file for your machine before starting any operations.

๐Ÿ“ Ensure YAML settings match your hardware specifications
2

Jumper Verification

Double-check and triple-verify that all jumper positions correspond correctly with your device's operation mode.(Do Not Forget Remove USB 5V jumper)

๐Ÿ”Œ Incorrect jumper settings may cause equipment damage
3

Power Application

Only proceed with power application after confirming all previous steps are correctly completed.

โšก Safe operation ensured through proper preparation
๐Ÿšจ

Critical Safety Reminder

Failure to follow these steps may result in equipment damage or operational failure. Please verify each item carefully before proceeding.

pibot_cnc_laser_series/v496_pro/hardware_connection.txt ยท Last modified: by admin

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki