- Make sure there is no short circuit between any input signal pin and GND before testing.
- Open the WebUI command line.
- Enter command: $limits
- Before inserting jumper caps, the monitor should scroll without trigger indications.
Display before inserting jumper caps:
$limits
Send ! to exit
Homing Axes : xyzabc
Limit Axes :
PosLimitPins NegLimitPins Probe Toolsetter
:
:
:
:
:
:
:
2
Trigger Test with Jumper Caps
💡 Use jumper caps to short each input SIGNAL pin to GND. There are 10 inputs to test in total. Test them one by one, or install all 10 jumper caps for a full trigger check.
Reference image: insert jumper caps between SIGNAL and GND for the probe and endstop input test.
- ⚠️ DO NOT short incorrect pins.
- Insert jumper caps between SIGNAL and GND.
- There are 10 jumper positions to test.
- After inserting the jumper caps, all tested switches and endstops should show a triggered state.
- The corresponding motherboard input indicator LEDs should all illuminate.
Display after inserting jumper caps:
: xy xyzabc P T
: xy xyzabc P T
: xy xyzabc P T
: xy xyzabc P T
: xy xyzabc P T
At the same time, the corresponding input indicator LEDs on the motherboard should be ON.